Illustrative flow. Conditions, events and gateway synchronization are not evaluated.

0 / 12000 ms
Structural exploration

Paused

connector-crossing Flowchart with 5 nodes and 7 structural connections. Playback illustrates structure and does not execute a workflow. Input A Output C Input B Output D After C